Project Name: | Tianjin 117 Lighting Project |
Project time : | December, 2013(Under Construction) |
Description: | Building structure of 117 (3 floors underground, 117 floors above ground, total design height of 600 meters or more, the number of F lights and M lights used in the tower is about 120,000 and 2600 meters respectively, and the length of the M1 lamp of the podium is about 2200 meters. |
Joinmax : | Lights R&D, production.Provide control system solutions. Control system production. On-site installation support for control system. |